2025 Air Source Heat Pump Install QA Logo
  • 2025 Air Source Heat Pump Install QA

  • Please review CMLP's Heat Pump Rebates for Your Home webpage carefully to ensure that you understand the 2025 rebates and eligibility criteria.

    If you have questions about this form, contact CMLP Energy Efficiency & Electrification Coordinator Jan Aceti, at jaceti@concordma.gov or 978-318-3151.

  • Customers of CMLP who heated, or still heat, their home primarily with natural gas are eligible for Mass Save's air-source heat pump rebates. CMLP does not offer rebates to these customers. Please refer to the Mass Save heat pump rebate webpage here, and assist your customer with applying for the applicable Mass Save rebate. The Mass Save program does not require a pre-install or post-install approval.

  •  
  • Program Requirements

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • If this project uses supplemental electric heat (electric resistance units/baseboards, existing heat pumps and/or ETS) in rooms other than bathrooms, the project is eligible for a whole home rebate only if the supplemental electric heat provides no more than 10% of the home's total heat load.

    Auxiliary electric resistance strips built into the heat pump itself or non-electric heating systems are allowed for emergency use but not supplemental heat in whole home heat pump projects.  Emergencies are heat pump maintenance/repair downtime or if the heat pump is unable to heat the home during an extreme weather event. 

  •  
  • Please use either Option 1 or Option 2 (not both) to provide CMLP with information that it can use to determine the percentage of the home's total heat load met by the supplemental electric heat.

  •  
  • OPTION 2: If the supplemental electric heat is electric resistance only or a combination of electric resistance, existing heat pumps and/or ETS, provide the information called for in either Option 2.A or Option 2B, but not both.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Please Note: The project electrician must obtain an electrical permit online prior to installation, and schedule an inspection by the Town's electrical inspector after the work is complete. If the project requires sheet metal ducting work that goes beyond minor repairs, a sheet metal permit must have been obtained, and an inspection scheduled. The project must pass all relevant inspections before this Install QA form can be submitted. Enter the relevant inspection approval dates below. More information about Town of Concord Building Department permits and inspections can be found in the Quality Assurance Section of CMLP's Heat Pump Rebates for Your Home page.  

  •  - -
  •  - -
  • ASHP System Design

  • Auxiliary/Backup Heating Strategy

  • System 1

  •  
  • System 2

  •  
  • System 3

  •  
  • System 4

  •  
  • Required Documents:

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  •  
  • Click "Save" if you wish to continue working on the form later. 

    Click "Submit" if you have finished filling out the form and wish to submit it to the Concord Municipal Light Plant for review. 

     

  • Image-22
  • Should be Empty: