  • If you have questions about this form, contact CMLP Energy Efficiency & Electrification Coordinator Jan Aceti, at jaceti@concordma.gov or 978-318-3151.

  • Customers of CMLP who heated their home primarily with natural gas before the heat pump installation are eligible for Mass Save's ground-source heat pump rebates. CMLP does not offer rebates to these customers. Please refer to the Mass Save heat pump rebate webpage here, and assist your customer with applying for the applicable Mass Save rebate. The Mass Save program does not require a pre-install or post-install approval.

  • Program Requirements

  • Please Note: 

    The project electrician must obtain an electrical permit online prior to installation, and schedule an inspection by the Town's electrical inspector after the work is complete. If the project requires sheet metal ducting work that goes beyond minor repairs, a sheet metal permit must have been obtained, and an inspection scheduled.The project must pass all relevant inspections before this Install QA form can be submitted. Enter the relevant inspection approval dates below. More information about Town of Concord Building Department permits and inspections can be found in the Quality Assurance Section of CMLP's Heat Pump Rebates for Your Home page.  

  •  - -
  •  - -
  • A drilling permit must have been obtained from the Concord Board of Health. Enter the permit issue date below. 

  •  - -
  • Project Details

  •  
  • GSHP System Design

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  •  
  •  
  •  
  •  
  • Invoice:

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  •  
  • Click "Save" if you wish to continue working on the form later. 

    Click "Submit" if you have finished filling out the form and wish to submit it to the Concord Municipal Light Plant for review. 

     

  • Image-22
  • Should be Empty: